Ironridge Steel
Manufacturing Facility
The Ironridge Facility was a milestone in industrial construction. Featuring 50-ton overhead cranes, temperature-controlled processing zones, and automated line operations, it reaffirmed The Fergie Company’s prowess in heavy-industry engineering. Built during a pivotal period of U.S. manufacturing resurgence, it remains a proud symbol of American industrial capability.
Customer
Ironridge Industrial Group
Location
Pittsburgh, USA
Project Cost
$ 92 Million
Contract Type
Sub-Contractor
Completion
2008